Taking off quantities - Structural metalwork
This is a short video dealing with taking off quantities for structural metalwork.

Duncan Cartlidge
1 day ago1 min read
Â
Â
Â


Taking off quantities - Composite concrete construction
This is an overview of taking off quantities for composite concrete construction

Duncan Cartlidge
Nov 171 min read
Â
Â
Â


Taking off quantities - Narrow widths
This is a short video dealing with taking off quantities for narrow widths in finishings and decoration.

Duncan Cartlidge
Nov 131 min read
Â
Â
Â


Taking off quantities - Hot & Cold Water Installations
This is an overview of the measurement of hot and cold water installations.

Duncan Cartlidge
Oct 61 min read
Â
Â
Â


Taking off Civil Engineering Quantities (CESMM4)
This short video is an overview of measuring civil engineering quantities

Duncan Cartlidge
Sep 221 min read
Â
Â
Â


Taking off top tip - Brickwork
This is a short video dealing with taking off quantities for brickwork.

Duncan Cartlidge
Sep 161 min read
Â
Â
Â


Taking off quantities: In-situ concrete
This is a short video dealing with taking off quantities for in-situ concrete.

Duncan Cartlidge
Sep 91 min read
Â
Â
Â


Taking off quantities - Below ground drainage
The short video presentation below outlines some of the issues involved with taking off quantities for below ground drainage.

Duncan Cartlidge
Sep 41 min read
Â
Â
Â


RICS Code of Measurement Practice
Many qs’s will be aware of the back lash from the profession when NRM2 was published. The new rules, it was thought, had been introduced without  consulting industry thereby alienating many of its members overnight

Duncan Cartlidge
Sep 22 min read
Â
Â
Â


Taking off top tips : Unknown unknowns
Traditionally a contingency sum was included to allow for unforseen additional costs but clients have always asked questions as why this allowance is necessary.

Duncan Cartlidge
Aug 281 min read
Â
Â
Â


Another taking off quantities top tip
Partitions are referred to on NRM2 in three work sections; 16, 20 and 22. Which section to use often causes confusion.

Duncan Cartlidge
Jul 31 min read
Â
Â
Â


Yet more taking off quantities top tips
Surface water is water on the surface of the site and excavations.
Disposal of surface water is deemed to be included in NRM2 Section 5. However SMM7 had previously required disposal of surface water to be measured as an item and confusion can occur as to what constitute surface water and ground water.

Duncan Cartlidge
Jun 191 min read
Â
Â
Â


Provisional quantities top tip
Provisional quantities should be avoided whenever possible, as rates can loaded in the hope of quantities increasing when remeasured.

Duncan Cartlidge
Jun 111 min read
Â
Â
Â


Taking off quantities top tip
Where appropriate, additional information shall be given to ensure full clarity of description. If in doubt give additional information regarding quality and location of work. For example, if the majority of brickwork is at ground floor level but there is also some at roof level the QS should measure the high level brickwork separately in the bill of quantities stating its location.

Duncan Cartlidge
Jun 91 min read
Â
Â
Â


Taking off quantities top tip
Taking off quantities using NRM2

Duncan Cartlidge
Feb 28, 20241 min read
Â
Â
Â


MMC : the silver bullet?
Modern methods of construction (MMC) is one of the main planks of the UK Government's Construction Playbook to 'Build back better.'

Duncan Cartlidge